PROFESSIONAL POWER INDUSTRY IN POLAND

 

LOCATION/END USER

WORKS DESCRIPTION

TIME OF EGZECUTION

CONTRACT PARTNER

Power Station Kozienice Manufacturing of steel structure for FGD of 200MW power units
2005 - 2006
Poltegor-Projekt

Power Station Stalowa Wola

Repair works of OP-380 No 13 boiler

2004

Rem-War

Power Station Kozienice

Dismantling/reinstallation of 10RS2 and 10RS3 stations

2004

Elektrownia Kozienice

Power Station Stalowa Wola

Repair works of OP-380 boiler No 12

2004

Rem-War

Power Station Stalowa Wola

Execution of turbine piping

2004

Energoserwis

Power Station Kozienice

Construction of 5RS1 station, dismantling/reinstallation of piping

2004

Power Station Kozienice

Power Station Kozienice

Revamping of 10RS1-3 station

2004

Power Station Kozienice

Power Station Kozienice

Revamping and repair works at boiler No 5

2004

ZRE Lublin

Power Station Kozienice

Dismantling/reinstallation of electrical precipitator of boiler No 5

2004

Power Station Kozienice

Power Station Kozienice

Delivery and erection of steel structure of flue gas ducts for revamping of stack No 2 smoke conduit

2004

Instal Kraków

Kozienice Power Station

Construction of 0,5 MPa steam collector of power unit No 1-8

2004

El. Kozienice

Power Station Stalowa Wola

Piping around turbine

2004

Energoserwis

Power Station Kozienice

Installation of 5RS1 station, replacement of piping

2004

Power Station Kozienice

Power Station Kozienice

Modernization of 10RS1-3

2004

Power Station Kozienice

Power Station Kozienice

Revamping and repair of boiler No. 5

2004

ZRE Lublin

Power Station Kozienice

Replacement of electrostatic precipitator in power unit No. 5

2004

Power Station Kozienice

Power Station Kozienice

Delivery and erection of steel structure and flue gas ducts associated with stack No. 2 smoke conduit revamping

2004

Instal Kraków

Power Station Pątnów II

Delivery and erection of de-mineralized water tanks and cold condensate tank

2002 - 2003

Alstom Power

Power Station Kozienice

Fabrication and erection of special tanks DEMI II

2002 - 2003

Instal Kraków

Power Station Kozienice

Construction of DEMI II station, erection of CO piping and construction of water intake

2002 - 2003

Power Station Kozienice

Power Station Turów

Delivery of steel structure for rotary air-heaters

2002

HRMC Polska

Power Station Pątnów II

Erection of air and flue gas ducts for power unit A (460 MW)

2002 - 2003

Elektrim-Energetyka

Power Station Pątnów II

Erection of boiler and boiler house steel structure of power unit A (460 MW)

2002 - 2003

Elektrim-Energetyka

Power Station Pątnów II

Delivery and erection of DEMI station for power unit A (460 MW)

2002

Alstom Power

Power Station Pątnów II

Fabrication and delivery of cold and hot air ducts and flue gas ducts for power unit A (460 MW)

2002

Fabryka Kotłów Rafako

Power Station Turów

Erection of mechanical equipment in turbine house for power units 5, 4 and 6

2001 - 2003

Alstom Power

Power Station Turów

Prefabrication, delivery and erection of steel structure for power units 5,4 and 6

2001 - 2003

Alstom Power

Power Station Bełchatów

Delivery and mechanical erection of FGD system for power units 7 and 9

2001 - 2002

Fabryka Kotłów Rafako

Heat & Power Station ELCHO Chorzów

Delivery of boiler hanging rods and supports

2001 - 2002

Foster Wheeler Energia Polska

Power Station Bełchatów

Revamping works of housing of diagonal coal feeding conveyor P I/II

2001 - 2002

Power Station Bełchatów

Heat & Power Stat. Lublin

Delivery and erection of piping for gas-steam power unit

2001

Skandinavisk Milijo Service

Heat & Power Stat. Lublin

Delivery and erection of steel structure

2000 - 2001

Lurgi Energie / Standardkessel Lentjes-Fasel

Power Station Turów

Fabrication and delivery of high pressure piping for power units 5, 4 and 6

2000 - 2003

Foster Wheeler Energia Polska

Power Station Turów

Dismantling of equipment in turbine house of power unit No. 5

2000

ABB Alstom Power

Heat & Power Station Żerań

Erection of steel structure and boiler equipment of CFB boiler (OFz-450 B )

1999 - 2000

Elektrim - Energetyka

Heat & Power Station Siekierki

Flue gas treatment system installation

2001

Alstom Power Kraków

Heat & Power Station Siekierki

Revamping of electrostatic precipitator of boiler OP-380 No 11

1999

ABB Zamech Kraków

Heat & Power Station Siekierki

Revamping of electrostatic precipitator of boiler OP-380 No 11

1999

Fabryka Elektrofiltrów Elwo

Power Station Kozienice

Manufacturing, delivery and erection of FGD plant for power units 500 MW (No 9 and 10)

1998 - 2000

IVO Power Eng. /Fortum/ Finlandia

Power Station Łaziska

Manufacturing and delivery of two absorbers for FGD system of 200 MW power units No 9, 10, 11 and 12

1998 - 1999

EM Południe/ Megadex

Power Station Jaworzno II

Delivery of high pressure piping of CFB boilers

1998 - 1999

Foster Wheeler Energia Polska

Power Station Bełchatów

Delivery and erection of FGD plant for power units 360 MW (5 and 6)

1998 - 1999

Fabryka Kotłów Rafako

Power Station Turów

Installation of turbogenerator 230 MW (power unit No 3)

1998 - 1999

ABB Zamech



PROFESSIONAL POWER INDUSTRY IN POLAND 1991 - 1998

 

LOCATION/END USER

WORKS DESCRIPTION

TIME OF EGZECUTION

CONTRACT PARTNER

Heat & Power Station Gdynia

Replacement (dismantling and re-erection) of electrostatic precipitator for boiler WP-120 No 5

1998

Fabryka Elektrofiltrów ELWO S.A

Power Station Kozienice

Delivery and erection of electrostatic precipitator for power unit 200 MW (No5)

1993

ABB Sweden

Heat & Power Stat. Katowice

Erection of turbine house of power unit BC 100

1998

Elektrim Megadex S.A.

Heat & Power Stat. Katowice

Delivery of high pressure piping for CFB boiler

1998

Foster Wheeler Energia Polska

Power Station Stalowa Wola

Replacement (dismantling and re-erection) of electrostatic precipitators for power units K 10 and K 11

1997 - 1998

Fabryka Elektrofiltrów ELWO S.A.

Heat & Power Station Gorzów Wielkopolski

Erection of, the first in Poland , gas-steam power unit GT 8

1997 - 1998

ABB Zamech

Power Station Turów

Erection of DEMI station with the output of 270 m 3 /h

1997 - 1998

Energoprojekt Katowice

Power Station Turów

Delivery of hot cyclones, bandages, piping, etc. for power unit No 3 -

1997 - 1998

Foster Wheeler / ABB Zamech

Heat & Power Station Elbląg

Revamping of electrostatic precipitators for boilers OP-130 No 6 and 7

1997

ABB Zamech

Heat & Power Stat. Siekierki

Erection of electrostatic precipitator for boiler OP-430

1997

Fabryka Elektrofiltrów Elwo

Power Station Połaniec

Delivery and erection of FGD plant for power units 220 MW (No 5, 6, 7 and 8

1996 - 1998

FLS Miljo - Dania

Power Station Turów

Erection of CFB boiler 650 t/h (No 2)

1996 - 1997

Elektrim / Foster Wheeler Pyropower

Power Station Turów

Deliveries of high, medium and low pressure piping, flue gas ducts, bandages, cyclones, piping, etc. for power units No 1 an 2 -

1996 - 1997

Foster Wheeler Pyropower / ABB Zamech

Heat & Power Station Białystok

Replacement (dismantling/ re-erection) of electrostatic precipitator for boiler WP-140

1996

ABB Zamech

Heat & Power Station Siekierki

Replacement (dismantling /re-erection) of electrostatic precipitators for boilers WP-120 (No 6 and 7)

1995

Fabryka Elektrofiltrów Elwo

Power Station Połaniec

Replacement (dismantling /re-erection) of electrostatic precipitators for boilers OP-650 (No 1, 2, 3, 6, 7 and 8)

1994 - 1998

Fabryka Elektrofiltrów Elwo

Power Station Kozienice

Prefabrication and erection of electrostatic precipitators for boilers OP-650 No 3 and 8

1994 - 1995

FLS Miljo - Dania

Heat & Power Station Białystok

Replacement (dismantling /re-erection) of electrostatic precipitator for boiler WP-70

1994

Fabryka Elektrofiltrów Elwo

Power Station Opole

Erection of turbine house of 360 MW units (No 3 and 4)

1993 - 1996

Power Station Opole

Power Station Ostrołęka

Replacement of three electrostatic precipitators of OP-650 boilers

1993 - 1995

FLS Miljo - Dania

Heat & Power Stat. Żerań

General Contractor - Replacement of OP-230 boiler No 8 for CFB boiler OFz-450 No 1

1993 - 1995

Fabryka Kotłów Rafako

Heat & Power Stat. Siekierki

Replacement of fresh steam collector together with piping for turbines 1, 2, 3, 5, and 6 and pressure reducing stations ORS-1, ORS-2, ORS-3, ORS-4

1993 - 1994

Zespół Elektrociepłowni Warszawa

Power Station Konin

Replacement of 70 MW turbo-generator No 4

1993 - 1994

Megadex Warszawa

Power Station Konin

Erection of installation reducing emission of SO 2 in flue gas from OP-230 boiler No 7

1993 - 1994

Zespół Elektrowni Pątnów - Adamów - Konin

Heat & Power Stat. Siekierki

Replacement (dismantling /re-erection) of electrostatic precipitator for OP-230 boiler

1993

Fabryka Elektrofiltrów Elwo

Heat & Power Stat. Siekierki

Fabrication and erection of piping thermal system of modernized TK-50 turbine No 1

1993

ABB Zamech Elbląg

Power Station Konin

Replacement of fresh steam piping from collector to turbine No 5

1993

Zespół Elektrowni Pątnów - Adamów - Konin

Power Station Bełchatów

Delivery and erection of FGD plant for 360 MW units No 10, 8, 11 and 12 as a General Contractor

1991 - 1996

ESTS Hoogovens Technical Services B.V. - Holland



PROFESSIONAL POWER INDUSTRY - EXPORT

 

LOCATION/END USER

WORKS DESCRIPTION.

TIME OF EGZECUTION

CONTRACT PARTNER

Hamm P.S. - GERMANY Repair works
2006
K&B Hermann Buschkotter
Becum - GERMANY Workshop contract
2006
K&B Hermann Buschkotter
Waldbrolm _ GERMANY Workshop contract
2006
SAW Stahlbau Waldbrol
Frechen - GERMANY Welding works
2006
MCE Energietechnik
Monachium, Kiel, Heide, BMW-Welt Munchen - GERMANY Dry plasters
2006 - 2007
ISO-Perfect GmbH
MATRA P.S. - HUNGARY Repair works of boiler
2006
MATRA P.S.
MATRA P.S. - HUNGARY Erection works
2006
TRANS EL
Budapest - HUNGARY Repair works
2006
GDHS
ISO-Perfekt Munich Insulation works
2005 - 2006
ISO-PERFEKT
KW Frankfurt Nordweststadt Piping erection
2005
MCE Energietechnik

IRELAND

Prefabrication and delivery of high pressure piping

2003 - 2004

Foster Wheeler Energia Oy

FINLAND

Manufacturing and delivery of steel structure and steel products

2003

Alstom Power Finland Oy

Wildau - GERMANY

Welding works

2001 - 2002

SMB Rohrleitungsbau Wildau

Neuss - GERMANY

Erection of s steel structure

2002

Industrieaanlagen-Montage

Niederaussem - GERMANY

Insulation works of ducts

2001 - 2002

H. Rosendaal

Buschhaus - GERMANY

Delivery and erection of FGD plant

2001 - 2002

TESSAG INA GmbH /zm. nazwy/ RWE Solution

HKW Sandreuth - GERMANY

Manufacturing of flue gas ducts and reactor

2001

Elektrim-Megadex

Niederaussen - GERMANY

Erection of steel structure and other equipment

1999 - 2000

Polimex-Cekop

Mannheim - GERMANY

Workshop works

1997 - 2003

Elektrim-Megadex

Poolbeg - UK

Delivery of boiler sections

1998 - 1999

Austrian Energy Austria

Russelsheim - GERMANY

Delivery of some parts and erection of modular 100 MW/80 MW gas-steam boiler

1998 - 1999

Babcock



PROFESSIONAL POWER INDUSTRY - EXPORT 1990 - 1998

 

LOCATION/END USER

WORKS DESCRIPTION.

TIME OF EGZECUTION

CONTRACT PARTNER

Hamburg - GERMANY

Erection of bag filters

1997 - 1998

Apparatebau Rothemühle

Melnik - Czech Republic

FGD plant (unit 1 x 500 MW and 2 x 200 MW)

1996 - 1998

Austrian Energy & Environment

Pocerady - Czech Republic

FGD plant 3 x 200 MW

1995 - 1997

Austrian Energy & Environment

Lünen - GERMANY

Erection of 560 t/h boiler

1995 - 1996

Babcock/ Steinmüller

Bayer Ürdingen - GERMANY

Major repair works of 150 t/h boiler

1995

Babcock

SENEA - SWEDEN

Delivery of absorber made of austenitic steel

1995

SENEA - Sweden

Schwandorf - GERMANY

Hopper erection of boiler combustion chamber

1994

Babcock

Aschaffenburg - GERMANY

Erection of 450 t/h boiler

1994

Babcock

HKW Frankfurt - GERMANY

Delivery and erection of HRSG for gas-steam power unit

1992 - 1993

Balcke Dürr/ Babcock

Khartoum Northern - SUDAN

Erection of two turbogenerators, 60 MW each

1991 - 1994

Budimex

Tiefstack - GERMANY

Delivery and erection of FGD plant

1991 - 1992

LCS

Goldenberg - Werk Hürth - Knapsak Köln - GERMANY

Erection of CFB boiler - 400 t/h

1991 - 1992

LCS/ EVT

Bayer Ürdingen - GERMANY

Erection of piping (100 t)

1991 - 1992

Lentjes

Bayer Ürdingen - GERMANY

Erection of 70 t/h boiler

1992 - 1993

Babcock

Bayer Ürdingen - GERMANY

Erection of 150 t/h CFB boiler

1991 - 1992

Babcock

Power Station Rostock - GERMANY

Delivery and erection of FGD absorber's head. Erection of pressure parts of 650 MW boiler

1991 - 1992

Babcock - GERMANY

Power Station Staudinger - GERMANY

Delivery and erection of absorber and flue gas ducts for FGD plant
Erection of Nox reducing plant, erection 650 t/hr boiler (No 5)

1990 - 1992

Lentjes - Bischoff - GERMANY

Kemerköy TURKEY

Erection of three turbogenerators, 200 MW each, together with complete piping and pumping station.

1989 - 1995

TEK/ Megadex



INDUSTRIAL POWER ENGINEERING

 

LOCATION/END USER

WORKS DESCRIPTION.

EXECUTION TIME

CONTRACT PARTNER

PKN ORLEN S.A. Poland Execution of repair works of boiler OOG-320 No 1 in the Workshop of Power and Heat Generating Plant of PKN ORLEN S.A
2005
PKN Orlen

Budapest Hungary

Reconstruction of 2 boilers in incinerating plant

2004

Budimex

Högdalen Sweden

Delivery and erection of steel structure and boiler piping for incinerating plant

2003 - 2004

Energo-Inwest

Krefeld , GERMANY

Supply contract - prefabrication of piping

2004 - 2005

Vom Hagen Mce Service

Berlin Bawag Reuter West - GERMANY

Delivery and erection of tanks and steel structure

2003 - 2004

Möller Materials Handling

Neckarsulm - GERMANY

Erection of steel structure in AUDI AG WerkNeckarsulm

2002 - 2004

Stahl - und Foerderanlagenbau Geschwenda

Düren / Geschwenda / Wesseling - GERMANY

Fabrication of steel structure and plate steelwork

2002 - 2004

Claus Queck / Stahl - und Foerderanlagenbau Geschwenda / KWE Stahlbautechnik Wesseling

Zakłady Celulozowe Franschach Świecie S.A., Poland

Erection of the boiler

2002 - 2003

Austrian Energy & Environment / Tessag KSH

PKN ORLEN, Poland

Replacement of OOG-320 boiler No 2

2002 - 2003

Fabryka Kotłów Rafako

ANWIL Włocławek, Poland

Repair works on boiler No 2 and equipment of unit No 2

2001

Rem-Will

Power Station Nowa Sarzyna , Poland

Erection of HRSG boiler for 110 MW power unit

1999 - 2000

Babcock

Monachium - GERMANY

Erection of two gas fired boilers for municipal heating station

1999

Babcock

Petrochemia Płock

Erection of OOG-320 No 1 boiler

1998 - 1999

Fabryka Kotłów Rafako

Stomil Olsztyn

Modernization (replacement) of electrostatic precipitators made by ELWO Pszczyna for OP-70 boilers No 1 and 2

1996 - 1997

Stomil Olsztyn

Heat & Power Station SZF Polpharma Starogard Gdański , Poland

Erection of CFB boilers (Ofz-75), erection of two turbogenerators 2 x 12 MW together with insulation and corrosion protection works. Delivery of some boiler components. Total tonnage of erected steel approx. 4,000 ton

1995 - 1998

Fabryka Kotłów Rafako

Petrochemia Płock, Poland

Replacement of OOG-320 boiler No 3

1995 - 1996

Fabryka Kotłów Rafako

International Paper Kwidzyn S.A., Poland

Boiler OP-140 - revamping and repair

1993 - 1999

International - Paper Kwidzyn



CRUDE OIL AND NATURAL GAS

 

LOCATION/END USER

WORKS DECSRIPTION

TIMING

CONTRACT PARTNER

PKN ORLEN S.A. Poland Execution of mechanical/erection works in the frame of No 11235 Project "Desulphurization of cracked petrol" - core system
2005 - 2006
PKN Orlen
PKN ORLEN S.A. Poland

Prefabrication and erection of SHP pipeline

2004 - 2005

Chemar

PKN ORLEN S.A. Poland

Mechanical erection of cryogenic ethylene tank

2004

PETRO Remont

PKN ORLEN S.A. Poland

Erection of pining of Polyolefin plant

2004

Polimex-Mostolstal Siedlce

PKN ORLEN S.A. Poland

Steel structure delivery

2004

Fluor Gliwice

PKN ORLEN S.A. Poland

Apparatuses revamping

2004

Chemar

PKN ORLEN S.A. Poland

Execution of works concerning piping junction of concrete tank

2004

PKN Orlen

PKN ORLEN S.A. Poland

Olefin Plant II - prefabrication and erection of process piping systems

2004

Polimex-Cekop/ Mostostal Zabrze Holding/ ABB Lummus Global

Gas Compression Station Włocławek

Dismantling/ reinstallation of inlet and outlet piping of gas cooler; repair of piping weld; piping preparation for testing

2004

ABB Zamech Gazpetro

PKN ORLEN, Poland

Mechanical equipment erection of Polypropylene (PP) and High Density Polyethylene (HDPE) plants

2004

Polimex-Cekop

PKN ORLEN, Poland

Execution of tie-ins in the mains of process and power piping systems

2004

PKN Orlen

PKN ORLEN S.A. Poland

Erection of piping and erection of equipment for Olefin II

2004

Chemar

PKN ORLEN, Poland

Erection of piping of propylene tank, erection of installation for liquid propylene loading and unloading from railroad tank trucks

2004

PKN Orlen

PKN ORLEN, Poland

Piping of butane tank

2004

PKN Orlen

Gas Compressor Station Ciechanów

Delivery, erection and start-up of complex gas piping system, mechanical erection of process equipment

2004

ABB Zamech GazPetro

Sweden

Fabrication and erection of storage tank for light fuel oil

2003 - 2004

Petrokraft AB

PKN ORLEN. Poland

Revamping of Petrochemical Water Units

2003

PKN Orlen

PKN ORLEN, Poland

Erection of Olefin II piping

2003 - 2004

ABB Lummus Global / Mostostal Zabrze / Polimex-Cekop

Beckum - Buschkötter - GERMANY

Insulation work in Leuna 2000 Refinery

2002 - 2003

Iso-Perfekt

FRANCE

Prefabrication and delivery of piping

2001 - 2003

Ponticelli Freres

Gas Compressor Station Włocławek , Poland

Fabrication and erection of final support for gas piping DN 1200

2001

ABB Zamech GazPetro

Gas Compressor Station Włocławek , Poland

Replacement of valves DN 1200 and DN 900

2001

ABB Zamech GazPetro

Gas Compressor Station Włocławek , Poland

Erection of compressor station 3 x 25 MW and installation of System Reducing/Measuring Station (SSRP)

1999 - 2000

ABB Zamech GazPetro

Gas Compressor Station Kondracki , Poland

Erection of compressor station 4 x 25 MW

1999

ABB Zamech

Slovnaft Refinery in Bratislava Slovakia

Repair and revamping of tanks

1998 - 2000

Chemopetrol Litvinov - - Czech Republic

Slovnaft Refinery in Bratislava Slovakia

Erection of technological piping

1998 - 1999

Potrubi Slovakia s.v.o. Kosice /Słowacja/

Gas Compressor Station Hołowczyce , Poland

Erection of compressor station 1 x 25 MW

1998 - 1999

ABB Zamech

Rafineria Gdańska S.A., Poland

Complex erection works: - prefabrication and erection of hydrogen recovery installation, prefabrication and erection of tanks and handling system of liquid sulfur, prefabrication and erection of heating network and technological piping heating system together with partial delivery of supporting structure. Total tonnage approx. 1,100 ton.

1998 - 1999

Fluor Daniel/ Rafineria Gdańska



CRUDE OIL AND NATURAL GAS 1990 - 1998

 

LOCATION/END USER

WORKS DECSRIPTION

TIMING

CONTRACT PARTNER

Petrochemia Płock, Poland

Disassembly of BUTADIEN installation

1998

Petrochemia Płock

Petrochemia Płock, Poland

Erection of FKK II equipment

1998

Petrochemia Płock

Petrochemia Płock, Poland

Erection of DRW VI installation

1998

Petrochemia Płock

Petrochemia Płock, Poland

Erection of Claus I installation

1998

Petrochemia Płock

Petrochemia Płock, Poland

Erection of material tanks for needs of HOG

1998

Petrochemia Płock

Petrochemia Płock, Poland

Modernization of DEMI station

1998

Petrochemia Płock

Petrochemia Płock, Poland

Repair of E 103 A equipment

1998

Petrochemia Płock

Chemical Works CHEMOPETROL Litvinov - Czech Republic

Design, prefabrication and erection of technological piping

1997 - 1998

Chemopetrol Litvinov - - Czech Republic

Petrochemia Płock, Poland

Erection of Hydrosulfren II installation

1997 - 1998

Petrochemia Płock

Rafineria Gdańska S.A., Poland

Erection of storage tanks for propane (LP6) in North Port and in Refinery - 8 pieces D=5600 mm; total weight 2400 ton

1997 - 1998

Rafineria Gdańska

Petrochemia Płock, Poland

Erection of water treatment system (SUW) - 500 m 3 /h

1997 - 1998

Petrochemia Płock

Petrochemia Płock, Poland

Delivery and erection of steel structure and erection of piping and equipment for hydrogen production

1995 - 1997

Petrochemia Płock

Petrochemia Płock, Poland

Erection of piping of demineralized water and steam at 35 ata i 6 ata

1995 - 1996

Petrochemia Płock

Steel Mill Salzgitter , GERMANY

Erection of blast air preheaters

1994 - 1996

Noell Hamburg - GERMANY

Petrochemia Płock, Poland

Repair of the boiler for catalytic cracking installation

1993 - 1996

Petrochemia Płock

Chemical Works CHEMOPETROL Litvinov - Czech Republic

Erection of installation for lead free gasoline production

1993 - 1995

Chemopetrol Litvinov - - Czech Republic

BASF , GERMANY

Erection of heat recovery boiler

1993 - 1994

Sterinmüller - GERMANY

Scholven Olefin IV - GERMANY

Erection of piping in Refinery

1991 - 1992

Dillinger Stahlbau Dillingen

Petrochemia Płock, Poland

Erection of steel structures and piping of reforming installation Nr 5

1991 - 1992

Petrochemia Płock

Johann Stahl Plant Mannheim - GERMANY

Works performed in Customer's shop - fabrication of tanks 5,000 m 3 - 10,000 m 3 ; fabrication of steel components for chemical equipment

1990 - 1992

Johann Stahl Mannheim - GERMANY

Mosellbay South Africa

Erection of piping in gas and coal refineries

1990 - 1991

Babcock RSA

Chemical Works DOW Chemical Stade - GERMANY

Delivery and erection of three bioreactors having total weight of 3100 ton. Erection of Containment tanks

1989 - 1991

Noell Hamburg - GERMANY

Hulls - GERMANY

Erection of tanks - 5000 m 3

1989

Johann Stahl Mannheim - GERMANY

Minerwa Refinery Mannheim - GERMANY

Erection of two tanks - 7000 m 3 each

1989

Johann Stahl Mannheim - GERMANY

Orenburg Pipeline /former Soviet Union /

Erection and start-up of four compressor stations

1976 - 1979

AEG Kanis /Mannesmann/ - GERMANY + Energopol, Poland



CHEMICAL INDUSTRY

 

LOCATION/END USER  

WORKS DESCRIPTION

EXECUTING TIME

CONTRACT PARTNER

ANWIL S.A. Włocławek

Replacing of diaphragm production technology of chlorine by membrane one - replacement of the tank of pure brine and T232 tank of 50% soda lye

2005
Anwil
ANWIL S.A. Włocławek Rehabilitation of Chlorine and Soda Lye Plant - erection of steel structure, setting of apparatuses and piping dismantling of CHLOR - Unit C05
2005
Anwil
Włocławek - PET Plant under construction, Poland Works connected with removal of break-down in PET Plan
2005
SK Eurochem

Włocławek - PET Plant under construction, Poland

Prefabrication and erection of piping in PET Plant in Włocławek

Delivery and erection of tanks and condenser in PET Plant in Włocławek

2004

Eurochem / Rem-Will

Zakłady Azotowe Puławy, Poland

Erection of equipment and piping for process line of Melamine III - facility E-225; erection of piping between Carbamide and Melamine III; fabrication and erection of steel bridge on the road "E" in Melamine III Dept.

2002 - 2004

Mostostal Puławy

ANWIL Włocławek, Poland

Adaptation of the column D-1451 "a" and "b" for needs of installation of synthesis gas drying - line "B". Modernization of brine tank V-107; Dismantling of LP system at construction site of vinyl chloride

2001

Anwil

ANWIL Włocławek, Poland

Mechanical repair works in the Polyvinyl Complex

2001

Anwil

ANWIL Włocławek, Poland

Erection of process line of Vinyl Chloride

2000 - 2001

Anwil

Zakłady Azotowe Puławy, Poland

Erection of installation for Melamine II Plant

2000 - 2001

Zakłady Azotowe Puławy

Zakłady Azotowe Puławy, Poland

Erection of drainage system from 4 Mpa steam collector upstream of shut-off valves DN 150

2000

Zakłady Azotowe Puławy

Institute of Artificial Fertilizers Puławy , Poland

Installation of process installation of hop extracts

2000

Instytut Nawozów Sztucznych Puławy

Uponor Polska Sochaczew

Construction of new manufacturing plant of plastic piping systems, together with complete infrastructure

1999 - 2000

Uponor Polska

 

Anwil Włocławek

Delivery and erection of nitro-chalk production plant

1999 - 2000

Prochem

Glue Mixing Plant in Szczecinek , Poland

Erection of equipment and technological piping (also made of stainless steel)

1994 - 1995

2004

Kronospan -

Szczecinek



SHIP BULDING INDUSTRY

LOCATION/END USER

WORKS DESCRIPTION

EXECUTING TIME

CONTRACT PARTNER

Flensburg , Germany

Fabrication of stern ramp
Weight: 147 t

2004

Macor Marine GmbH

Gedser Habour

Fabrication of stern ramp
Weight : 90 t

2004

BLADT Industries A/S

Denmark - Group of wind power plants

Delivery and erection of the transformer platform for wind power station - weight 350 ton

2003

Bladt - Denmark

Denmark, Pole Nini & Cecilie

Erection of 8 decks for two mining platforms - weight 550 ton

2003

Bladt - Denmark

USA , US Navy Yard

Erection of stern loading platforms - weight 149 ton

2003

MacGregor Sweden

Norway

Delivery of pontoons for fish farm - weight 54 ton

2003

Techmat Norway

Poland , Shipyard Gdynia

Delivery of hull section - weight 40 ton

2002

Shipyard Gdynia

France, Shipyard Chantiers de l'Atlantique

Delivery of auxiliary access platform - weight 20 ton

2002

Macor Neptun Germany

Holland , Shipyard Van der Giessen

Delivery of stern port - weight 41 ton

2002

TTS Sweden

Spain , Shipyard Astilleros Espanoles'

Erection of two shaft elevator for transportation of railroad cars inside the ferry

2002

MacGregor Sweden

Chantiers de l'Atlantique H32

Delivery of ship doors and platforms

2002

Macor Neptun

Kalliste/ Oresund

Delivery of steel structures

2002

MacGregor SWE/ TTS SWE

Grenaa/ Varberg/ Trelleborg

Delivery of loading ramps

2002

Bladt Industries

Shipyard Remontowa Gdańsk

Delivery of piping

2001

Stocznia Remontowa Gdańsk

Finland

Delivery of hatchway covers

2001

MacGregor FIN

Shipyard Gdynia

Delivery of hatchway covers and hull section

2001

Shipyard Gdynia

Arhus - Denmark

Delivery of cranes for containers - weight 900 ton

2000

Konecranes - Finland

Shipyard Gdynia

Prefabrication and erection of piping systems made of austenitic steel AISI 304L and AISI 316L - deck installation on ships. Weight of installation 120 ton.

since 1999

Shipyard Gdynia

Kotka Finland Barcelona Spain Savannah USA

Delivery of structural steel of cranes, working in container terminals.

1998

Konecranes - Finland

Indonesia

Delivery of structural steel for conveyors.

1992

Konewood



FOOD INDUSTRY

LOCATION/END USER

WORKS DESCRIPTION

EXECUTING TIME

CONTRACT PARTNER

Brewery Kasztelan
Sierpc

Erection of equipment for vertical transportation in elevator building

2004

Danish Malting Group Poland

Brewery Heweliusz
Gdańsk

Erection of: gas-steam boiler house 3 x 10 t/h, steam and technological piping. Delivery and erection of the stack with modular insert

1999

Elbrewery - Elblag

Elbrewery Co Ltd. Elbląg

Revamping and enlargement of water treatment station in cooperation with Berkofeld Filter

1995 - 1999

Elbrewery - Elblag

Elbrewery Co Ltd. Elbląg

Delivery and erection of new installation for beer distribution and purification.

1994

Elbrewery - Elblag

Elbrewery Co Ltd. Elbląg

Revamping of steam pressure reducing station.

1994

Elbrewery - Elblag

Elbrewery Co Ltd. Elbląg

Complex revamping of brewing facility in cooperation with A. Ziemann GmbH.

1994

Elbrewery - Elblag

Kożuszki, Poland

Delivery and erection of steel structure for chocolate factory

1994 - 1995

Master Foods Poland

Kożuszki, Poland

Delivery and erection of steel structure of office building

1994

Master Foods Poland

Kożuszki, Poland

Delivery and erection of steel structure for manufacturing facility

1993 - 1994

Master Foods Poland


CEMENT PLANTS

LOCATION/END USER

WORKS DESCRIPTION

EXECUTING TIME

CONTRACT PARTNER

Cement Plant Ożarów

Repair of equipment (conveyors, pumps, filters, etc.); deliveries of steel structure components and tanks (cement containers)

1997 - 1998

Cement Plant Ożarów

Cement Plant Strzelce Opolskie

Dismantling and reinstallation of pulverizes of raw material, checking of gears, delivery and erection of piping.

1995 - 1996

Cement Plant Strzelce Opolskie

Cement Plant Strzelce Opolskie

Prefabrication and erection of the electrostatic precipitator.

1995

ABB Fläkt



PULP AND PAPER INDUSTRY

LOCATION/END USER

WORKS DESCRIPTION

EXECUTING TIME

CONTRACT PARTNER

International Paper Kwidzyn

Revamping of technological tanks (including piping)

2000 - 2001

International Paper Kwidzyn

Paper Plant ICT in Kostrzyn n/Odrą

Prefabrication and erection of tanks made of stainless steel

2001

BE&K Europe

International Paper Kwidzyn

Revamping of technological tanks and associated piping during the shut-down

1993 - 1999

International Paper Kwidzyn


INFRASTRUCTURE CONSTRUCTION

LOCATION/END USER

WORKS DESCRIPTION

EXECUTING TIME

CONTRACT PARTNER

Hannover - GERMANY

Erection of structural steel and sound shields along the fast railroad

2002 - 2003

Inkon

- GERMANY

Erection of steel barriers on overpasses on motorway Köln - Frankfurt

2002

Inkon

Wisłostrada - street in Warsaw

Steel structure erection in the pit of tunnel on Wisłostrada

2001 - 2003

Hydrobudowa-6

Management of Border Crossings Terespol

Fabrication and erection of steel structure at border crossing in Sławatycze

1998

Przedsiębiorstwo Usług Inwestycyjnych Biała Podlaska

Bridge on Narew River in Ostrołeka

Erection of one-arc bridge the longest one in Poland

1994

ABB Sweden

Pedestrian Bridges in Warsaw

Delivery and erection of bridges

1986 - 1992

 



MUNICIPAL CONSTRUCTION

LOCATION/END USER

WORKS DESCRIPTION

EXECUTING TIME

CONTRACT PARTNER

Budapest
Hungary

Reconstruction of 2 boilers in incinerating plant

2004

Budimex

Högdalen
Sweden

Delivery and erection of steel structure and boiler piping at incinerating plant

2003 - 2004

Energo-Inwest

Nuremberg GERMANY

Erection and start-up of 3 boilers in incinerating plant

2000

Elektrim-Energetyka

ZUSOK
Warszawa

Delivery and erection of equipment for municipal incinerating plant

1998 - 1999

Budimex



MUNICIPAL CONSTRUCTION
1990 - 1998

LOCATION/END USER

WORKS DESCRIPTION

EXECUTING TIME

CONTRACT PARTNER

Hamburg GERMANY

Erection of two fluidized bed boilers in incinerating plant

1997 - 1998

Steinmüller

RMVA KÖLN GERMANY

Erection of four boilers in municipal incinerating plant - 67 t/h of stem each one

1996 - 1998

Babcock Steinmüller

Hamburg GERMANY

Erection of three fluidized bed boilers for incineration of slime from sewage-treatment plant

1996

Austrian Energy and Environment

Sewage Treatment Plant Belsk Duży

Construction of communal sewage-treatment plant

1995

Urząd Gminy Belsk Duży

Sewage Treatment Plant \"Czajka\" Warsaw

Construction of bio-reactor with aeration system

1993

Dyrekcja Budowy Wodociągu Północnego i Oczyszczania Ścieków Warsaw

Essen - Karnap GERMANY

Erection of boiler in incinerating plant - 7 t/h of steam

1992 - 1993

Babcock

Wuppertal GERMANY

Erection of boiler in incinerating plant - 50 t/h of steam

1990 - 1991

VKW

Budapest Hungary

Erection of four boilers in municipal incinerating plant

1988 - 1991

Chemokomplex


INDUSTRIAL CONSTRUCION

LOCATION/END USER

WORKS DESCRIPTION

EXECUTING TIME

CONTRACT PARTNER

Kopalnia Węgla Brunatnego Bełchatów S.A.

Construction of TZ-1/T-G4 back-up facilities for dumping and mining services, Stalowa Wola

2000 - 2001

Brown Coal Mine Bełchatów S.A.

Car Showroom Stalowa Wola

Fabrication of steel structure of car showroom for Citroen cars

2000

Boker

Stalowa Wola

KNAUF Bauprodukte

Construction of Manufacturing Plant for KNAUF company, Stalowa Wola

1999 - 2000

KNAUF Bauprodukte

Building of Moorkens Showroom Warsaw

Construction of show/store room and offices

1999 - 2000

Progres Construction

Galeria Mokotów Shopping Center Warsaw

Steel structure and dome fabrication and erection

1999 - 2001

GTC/Warbud

 

SERVICE CONSTRUCTION 1990 - 1998

LOCATION/END USER

WORKS DESCRIPTION

EXECUTING TIME

CONTRACT PARTNER

IKEA Shopping Center Janki
Warsaw

Construction of shopping facilities

1995

H & O Construction

Huta Stalowa Wola

Construction of service building hall

1991

Steel Mill Stalowa Wola


APARTMENT BUILDINGS
 

LOCATION/END USER

Surface in m 2

EXECUTING TIME

Apartment Building Budapest

7 930 m 2

2001-2002

Housing Development Orzycka Warsaw

20 078 m 2

2000-2002

Housing Development Julianów, Warsaw

15 000 m 2

2000-2002

Building in Brwinów , Poland

2 100 m 2

2000-2002

Housing Development Malborska, Warsaw

40 000 m 2

1999-2002

Housing Development Natolin 2000, Warsaw

30 000 m 2

1999-2002

Housing Development Grzymalitów, Warsaw

8 000 m 2

1999-2000

Housing Development Jantar IV, Warsaw

30 000 m 2

1998-2000

 

APARTMENT BUILDINGS 1980 - 1990

LOCATION/END USER

Surface in m 2

EXECUTING TIME

Apartment/service buildings,
ul. Sołtana, Warsaw  

6 000 m 2

1984-1989

Apartment Buildings
ul. Hoża, Warsaw

20 000 m 2

1984-1992

Apartment Building
ul. Gwardzistów, Warsaw

2 000 m 2

1980-1983




    [back]
   







ENERGOMONTAŻ-PÓŁNOC S.A.
00-450 Warszawa, ul. Przemysłowa 30, tel. (022) 583 60 00;
e-mail: info@energomontaz.com.pl