PROFESSIONAL POWER INDUSTRY IN POLAND
|
LOCATION/END USER |
WORKS DESCRIPTION |
TIME OF EGZECUTION |
CONTRACT PARTNER |
 |
Power Station Kozienice |
Manufacturing of steel structure for FGD of 200MW power units |
2005 - 2006 |
Poltegor-Projekt |

|
Power Station Stalowa Wola |
Repair works of OP-380 No 13 boiler |
2004 |
Rem-War |

|
Power Station Kozienice |
Dismantling/reinstallation of 10RS2 and 10RS3 stations |
2004 |
Elektrownia Kozienice |

|
Power Station Stalowa Wola |
Repair works of OP-380 boiler No 12 |
2004 |
Rem-War |

|
Power Station Stalowa Wola |
Execution of turbine piping |
2004 |
Energoserwis |

|
Power Station Kozienice |
Construction of 5RS1 station, dismantling/reinstallation of piping |
2004 |
Power Station Kozienice |

|
Power Station Kozienice |
Revamping of 10RS1-3 station |
2004 |
Power Station Kozienice |

|
Power Station Kozienice |
Revamping and repair works at boiler No 5 |
2004 |
ZRE Lublin |

|
Power Station Kozienice |
Dismantling/reinstallation of electrical precipitator of boiler No 5 |
2004 |
Power Station Kozienice |

|
Power Station Kozienice |
Delivery and erection of steel structure of flue gas ducts for revamping of stack No 2 smoke conduit |
2004 |
Instal Kraków |

|
Kozienice Power Station |
Construction of 0,5 MPa steam collector of power unit No 1-8 |
2004 |
El. Kozienice |

|
Power Station Stalowa Wola |
Piping around turbine |
2004 |
Energoserwis |

|
Power Station Kozienice |
Installation of 5RS1 station, replacement of piping |
2004 |
Power Station Kozienice |

|
Power Station Kozienice |
Modernization of 10RS1-3 |
2004 |
Power Station Kozienice |

|
Power Station Kozienice |
Revamping and repair of boiler No. 5 |
2004 |
ZRE Lublin |

|
Power Station Kozienice |
Replacement of electrostatic precipitator in power unit No. 5 |
2004 |
Power Station Kozienice |

|
Power Station Kozienice |
Delivery and erection of steel structure and flue gas ducts associated with stack No. 2 smoke conduit revamping |
2004 |
Instal Kraków |

|
Power Station Pątnów II |
Delivery and erection of de-mineralized water tanks and cold condensate tank |
2002 - 2003 |
Alstom Power |

|
Power Station Kozienice |
Fabrication and erection of special tanks DEMI II |
2002 - 2003 |
Instal Kraków |

|
Power Station Kozienice |
Construction of DEMI II station, erection of CO piping and construction of water intake |
2002 - 2003 |
Power Station Kozienice |

|
Power Station Turów |
Delivery of steel structure for rotary air-heaters |
2002 |
HRMC Polska |

|
Power Station Pątnów II |
Erection of air and flue gas ducts for power unit A (460 MW) |
2002 - 2003 |
Elektrim-Energetyka |

|
Power Station Pątnów II |
Erection of boiler and boiler house steel structure of power unit A (460 MW) |
2002 - 2003 |
Elektrim-Energetyka |

|
Power Station Pątnów II |
Delivery and erection of DEMI station for power unit A (460 MW) |
2002 |
Alstom Power |

|
Power Station Pątnów II |
Fabrication and delivery of cold and hot air ducts and flue gas ducts for power unit A (460 MW) |
2002 |
Fabryka Kotłów Rafako |

|
Power Station Turów |
Erection of mechanical equipment in turbine house for power units 5, 4 and 6 |
2001 - 2003 |
Alstom Power |

|
Power Station Turów |
Prefabrication, delivery and erection of steel structure for power units 5,4 and 6 |
2001 - 2003 |
Alstom Power |

|
Power Station Bełchatów |
Delivery and mechanical erection of FGD system for power units 7 and 9 |
2001 - 2002 |
Fabryka Kotłów Rafako |

|
Heat & Power Station ELCHO Chorzów |
Delivery of boiler hanging rods and supports |
2001 - 2002 |
Foster Wheeler Energia Polska |

|
Power Station Bełchatów |
Revamping works of housing of diagonal coal feeding conveyor P I/II |
2001 - 2002 |
Power Station Bełchatów |

|
Heat & Power Stat. Lublin |
Delivery and erection of piping for gas-steam power unit |
2001 |
Skandinavisk Milijo Service |

|
Heat & Power Stat. Lublin |
Delivery and erection of steel structure |
2000 - 2001 |
Lurgi Energie / Standardkessel Lentjes-Fasel |

|
Power Station Turów |
Fabrication and delivery of high pressure piping for power units 5, 4 and 6 |
2000 - 2003 |
Foster Wheeler Energia Polska |

|
Power Station Turów |
Dismantling of equipment in turbine house of power unit No. 5 |
2000 |
ABB Alstom Power |

|
Heat & Power Station Żerań |
Erection of steel structure and boiler equipment of CFB boiler (OFz-450 B ) |
1999 - 2000 |
Elektrim - Energetyka |

|
Heat & Power Station Siekierki |
Flue gas treatment system installation |
2001 |
Alstom Power Kraków |

|
Heat & Power Station Siekierki |
Revamping of electrostatic precipitator of boiler OP-380 No 11 |
1999 |
ABB Zamech Kraków |

|
Heat & Power Station Siekierki |
Revamping of electrostatic precipitator of boiler OP-380 No 11 |
1999 |
Fabryka Elektrofiltrów Elwo |

|
Power Station Kozienice |
Manufacturing, delivery and erection of FGD plant for power units 500 MW (No 9 and 10) |
1998 - 2000 |
IVO Power Eng. /Fortum/ Finlandia |

|
Power Station Łaziska |
Manufacturing and delivery of two absorbers for FGD system of 200 MW power units No 9, 10, 11 and 12 |
1998 - 1999 |
EM Południe/ Megadex |

|
Power Station Jaworzno II |
Delivery of high pressure piping of CFB boilers |
1998 - 1999 |
Foster Wheeler Energia Polska |

|
Power Station Bełchatów |
Delivery and erection of FGD plant for power units 360 MW (5 and 6) |
1998 - 1999 |
Fabryka Kotłów Rafako |

|
Power Station Turów |
Installation of turbogenerator 230 MW (power unit No 3) |
1998 - 1999 |
ABB Zamech |
PROFESSIONAL POWER INDUSTRY IN POLAND 1991 - 1998
|
LOCATION/END USER |
WORKS DESCRIPTION |
TIME OF EGZECUTION |
CONTRACT PARTNER |

|
Heat & Power Station Gdynia |
Replacement (dismantling and re-erection) of electrostatic precipitator for boiler WP-120 No 5 |
1998 |
Fabryka Elektrofiltrów ELWO S.A |

|
Power Station Kozienice |
Delivery and erection of electrostatic precipitator for power unit 200 MW (No5) |
1993 |
ABB Sweden |

|
Heat & Power Stat. Katowice |
Erection of turbine house of power unit BC 100 |
1998 |
Elektrim Megadex S.A. |

|
Heat & Power Stat. Katowice |
Delivery of high pressure piping for CFB boiler |
1998 |
Foster Wheeler Energia Polska |

|
Power Station Stalowa Wola |
Replacement (dismantling and re-erection) of electrostatic precipitators for power units K 10 and K 11 |
1997 - 1998 |
Fabryka Elektrofiltrów ELWO S.A. |

|
Heat & Power Station Gorzów Wielkopolski |
Erection of, the first in Poland , gas-steam power unit GT 8 |
1997 - 1998 |
ABB Zamech |

|
Power Station Turów |
Erection of DEMI station with the output of 270 m 3 /h |
1997 - 1998 |
Energoprojekt Katowice |

|
Power Station Turów |
Delivery of hot cyclones, bandages, piping, etc. for power unit No 3 - |
1997 - 1998 |
Foster Wheeler / ABB Zamech |

|
Heat & Power Station Elbląg |
Revamping of electrostatic precipitators for boilers OP-130 No 6 and 7 |
1997 |
ABB Zamech |

|
Heat & Power Stat. Siekierki |
Erection of electrostatic precipitator for boiler OP-430 |
1997 |
Fabryka Elektrofiltrów Elwo |

|
Power Station Połaniec |
Delivery and erection of FGD plant for power units 220 MW (No 5, 6, 7 and 8 |
1996 - 1998 |
FLS Miljo - Dania |

|
Power Station Turów |
Erection of CFB boiler 650 t/h (No 2) |
1996 - 1997 |
Elektrim / Foster Wheeler Pyropower |

|
Power Station Turów |
Deliveries of high, medium and low pressure piping, flue gas ducts, bandages, cyclones, piping, etc. for power units No 1 an 2 - |
1996 - 1997 |
Foster Wheeler Pyropower / ABB Zamech |

|
Heat & Power Station Białystok |
Replacement (dismantling/ re-erection) of electrostatic precipitator for boiler WP-140 |
1996 |
ABB Zamech |

|
Heat & Power Station Siekierki |
Replacement (dismantling /re-erection) of electrostatic precipitators for boilers WP-120 (No 6 and 7) |
1995 |
Fabryka Elektrofiltrów Elwo |

|
Power Station Połaniec |
Replacement (dismantling /re-erection) of electrostatic precipitators for boilers OP-650 (No 1, 2, 3, 6, 7 and 8) |
1994 - 1998 |
Fabryka Elektrofiltrów Elwo |

|
Power Station Kozienice |
Prefabrication and erection of electrostatic precipitators for boilers OP-650 No 3 and 8 |
1994 - 1995 |
FLS Miljo - Dania |

|
Heat & Power Station Białystok |
Replacement (dismantling /re-erection) of electrostatic precipitator for boiler WP-70 |
1994 |
Fabryka Elektrofiltrów Elwo |

|
Power Station Opole |
Erection of turbine house of 360 MW units (No 3 and 4) |
1993 - 1996 |
Power Station Opole |

|
Power Station Ostrołęka |
Replacement of three electrostatic precipitators of OP-650 boilers |
1993 - 1995 |
FLS Miljo - Dania |

|
Heat & Power Stat. Żerań |
General Contractor - Replacement of OP-230 boiler No 8 for CFB boiler OFz-450 No 1 |
1993 - 1995 |
Fabryka Kotłów Rafako |

|
Heat & Power Stat. Siekierki |
Replacement of fresh steam collector together with piping for turbines 1, 2, 3, 5, and 6 and pressure reducing stations ORS-1, ORS-2, ORS-3, ORS-4 |
1993 - 1994 |
Zespół Elektrociepłowni Warszawa |

|
Power Station Konin |
Replacement of 70 MW turbo-generator No 4 |
1993 - 1994 |
Megadex Warszawa |

|
Power Station Konin |
Erection of installation reducing emission of SO 2 in flue gas from OP-230 boiler No 7 |
1993 - 1994 |
Zespół Elektrowni Pątnów - Adamów - Konin |

|
Heat & Power Stat. Siekierki |
Replacement (dismantling /re-erection) of electrostatic precipitator for OP-230 boiler |
1993 |
Fabryka Elektrofiltrów Elwo |

|
Heat & Power Stat. Siekierki |
Fabrication and erection of piping thermal system of modernized TK-50 turbine No 1 |
1993 |
ABB Zamech Elbląg |

|
Power Station Konin |
Replacement of fresh steam piping from collector to turbine No 5 |
1993 |
Zespół Elektrowni Pątnów - Adamów - Konin |

|
Power Station Bełchatów |
Delivery and erection of FGD plant for 360 MW units No 10, 8, 11 and 12 as a General Contractor |
1991 - 1996 |
ESTS Hoogovens Technical Services B.V. - Holland |
PROFESSIONAL POWER INDUSTRY - EXPORT
|
LOCATION/END USER |
WORKS DESCRIPTION. |
TIME OF EGZECUTION
|
CONTRACT PARTNER |
 |
Hamm P.S. - GERMANY |
Repair works |
2006 |
K&B Hermann Buschkotter |
 |
Becum - GERMANY |
Workshop contract |
2006 |
K&B Hermann Buschkotter |
 |
Waldbrolm _ GERMANY |
Workshop contract |
2006 |
SAW Stahlbau Waldbrol |
 |
Frechen - GERMANY |
Welding works |
2006 |
MCE Energietechnik |
 |
Monachium, Kiel, Heide, BMW-Welt Munchen - GERMANY |
Dry plasters |
2006 - 2007 |
ISO-Perfect GmbH |
 |
MATRA P.S. - HUNGARY |
Repair works of boiler |
2006 |
MATRA P.S. |
 |
MATRA P.S. - HUNGARY |
Erection works |
2006 |
TRANS EL |
 |
Budapest - HUNGARY |
Repair works |
2006 |
GDHS |
 |
ISO-Perfekt Munich |
Insulation works |
2005 - 2006 |
ISO-PERFEKT |
 |
KW Frankfurt Nordweststadt |
Piping erection |
2005 |
MCE Energietechnik |

|
IRELAND |
Prefabrication and delivery of high pressure piping |
2003 - 2004 |
Foster Wheeler Energia Oy |

|
FINLAND |
Manufacturing and delivery of steel structure and steel products |
2003 |
Alstom Power Finland Oy |

|
Wildau - GERMANY |
Welding works |
2001 - 2002 |
SMB Rohrleitungsbau Wildau |

|
Neuss - GERMANY |
Erection of s steel structure |
2002 |
Industrieaanlagen-Montage |

|
Niederaussem - GERMANY |
Insulation works of ducts |
2001 - 2002 |
H. Rosendaal |

|
Buschhaus - GERMANY |
Delivery and erection of FGD plant |
2001 - 2002 |
TESSAG INA GmbH /zm. nazwy/ RWE Solution |

|
HKW Sandreuth - GERMANY |
Manufacturing of flue gas ducts and reactor |
2001 |
Elektrim-Megadex |

|
Niederaussen - GERMANY |
Erection of steel structure and other equipment |
1999 - 2000 |
Polimex-Cekop |

|
Mannheim - GERMANY |
Workshop works |
1997 - 2003 |
Elektrim-Megadex |

|
Poolbeg - UK |
Delivery of boiler sections |
1998 - 1999 |
Austrian Energy Austria |

|
Russelsheim - GERMANY |
Delivery of some parts and erection of modular 100 MW/80 MW gas-steam boiler |
1998 - 1999 |
Babcock |
PROFESSIONAL POWER INDUSTRY - EXPORT 1990 - 1998
|
LOCATION/END USER |
WORKS DESCRIPTION. |
TIME OF EGZECUTION |
CONTRACT PARTNER |

|
Hamburg - GERMANY |
Erection of bag filters |
1997 - 1998 |
Apparatebau Rothemühle |

|
Melnik - Czech Republic |
FGD plant (unit 1 x 500 MW and 2 x 200 MW) |
1996 - 1998 |
Austrian Energy & Environment |

|
Pocerady - Czech Republic |
FGD plant 3 x 200 MW |
1995 - 1997 |
Austrian Energy & Environment |

|
Lünen - GERMANY |
Erection of 560 t/h boiler |
1995 - 1996 |
Babcock/ Steinmüller |

|
Bayer Ürdingen - GERMANY |
Major repair works of 150 t/h boiler |
1995 |
Babcock |

|
SENEA - SWEDEN |
Delivery of absorber made of austenitic steel |
1995 |
SENEA - Sweden |

|
Schwandorf - GERMANY |
Hopper erection of boiler combustion chamber |
1994 |
Babcock |

|
Aschaffenburg - GERMANY |
Erection of 450 t/h boiler |
1994 |
Babcock |

|
HKW Frankfurt - GERMANY |
Delivery and erection of HRSG for gas-steam power unit |
1992 - 1993 |
Balcke Dürr/ Babcock |

|
Khartoum Northern - SUDAN |
Erection of two turbogenerators, 60 MW each |
1991 - 1994 |
Budimex |

|
Tiefstack - GERMANY |
Delivery and erection of FGD plant |
1991 - 1992 |
LCS |

|
Goldenberg - Werk Hürth - Knapsak Köln - GERMANY |
Erection of CFB boiler - 400 t/h |
1991 - 1992 |
LCS/ EVT |

|
Bayer Ürdingen - GERMANY |
Erection of piping (100 t) |
1991 - 1992 |
Lentjes |

|
Bayer Ürdingen - GERMANY |
Erection of 70 t/h boiler |
1992 - 1993 |
Babcock |

|
Bayer Ürdingen - GERMANY |
Erection of 150 t/h CFB boiler |
1991 - 1992 |
Babcock |

|
Power Station Rostock - GERMANY |
Delivery and erection of FGD absorber's head. Erection of pressure parts of 650 MW boiler
|
1991 - 1992 |
Babcock - GERMANY |

|
Power Station Staudinger - GERMANY |
Delivery and erection of absorber and flue gas ducts for FGD plant
Erection of Nox reducing plant, erection 650 t/hr boiler (No 5) |
1990 - 1992 |
Lentjes - Bischoff - GERMANY |

|
Kemerköy TURKEY |
Erection of three turbogenerators, 200 MW each, together with complete piping and pumping station. |
1989 - 1995 |
TEK/ Megadex |
INDUSTRIAL POWER ENGINEERING
|
LOCATION/END USER |
WORKS DESCRIPTION. |
EXECUTION TIME |
CONTRACT PARTNER |
 |
PKN ORLEN S.A. Poland |
Execution of repair works of boiler OOG-320 No 1 in the Workshop of Power and Heat Generating Plant of PKN ORLEN S.A |
2005 |
PKN Orlen |

|
Budapest Hungary |
Reconstruction of 2 boilers in incinerating plant |
2004 |
Budimex |

|
Högdalen Sweden |
Delivery and erection of steel structure and boiler piping for incinerating plant |
2003 - 2004 |
Energo-Inwest |

|
Krefeld , GERMANY |
Supply contract - prefabrication of piping |
2004 - 2005 |
Vom Hagen Mce Service |

|
Berlin Bawag Reuter West - GERMANY |
Delivery and erection of tanks and steel structure |
2003 - 2004 |
Möller Materials Handling |

|
Neckarsulm - GERMANY |
Erection of steel structure in AUDI AG WerkNeckarsulm |
2002 - 2004 |
Stahl - und Foerderanlagenbau Geschwenda |

|
Düren / Geschwenda / Wesseling - GERMANY |
Fabrication of steel structure and plate steelwork |
2002 - 2004 |
Claus Queck / Stahl - und Foerderanlagenbau Geschwenda / KWE Stahlbautechnik Wesseling |

|
Zakłady Celulozowe Franschach Świecie S.A., Poland |
Erection of the boiler |
2002 - 2003 |
Austrian Energy & Environment / Tessag KSH |

|
PKN ORLEN, Poland |
Replacement of OOG-320 boiler No 2 |
2002 - 2003 |
Fabryka Kotłów Rafako |

|
ANWIL Włocławek, Poland |
Repair works on boiler No 2 and equipment of unit No 2 |
2001 |
Rem-Will |

|
Power Station Nowa Sarzyna , Poland |
Erection of HRSG boiler for 110 MW power unit |
1999 - 2000 |
Babcock |

|
Monachium - GERMANY |
Erection of two gas fired boilers for municipal heating station |
1999 |
Babcock |

|
Petrochemia Płock |
Erection of OOG-320 No 1 boiler |
1998 - 1999 |
Fabryka Kotłów Rafako |

|
Stomil Olsztyn |
Modernization (replacement) of electrostatic precipitators made by ELWO Pszczyna for OP-70 boilers No 1 and 2 |
1996 - 1997 |
Stomil Olsztyn |

|
Heat & Power Station SZF Polpharma Starogard Gdański , Poland |
Erection of CFB boilers (Ofz-75), erection of two turbogenerators 2 x 12 MW together with insulation and corrosion protection works. Delivery of some boiler components. Total tonnage of erected steel approx. 4,000 ton |
1995 - 1998 |
Fabryka Kotłów Rafako |

|
Petrochemia Płock, Poland |
Replacement of OOG-320 boiler No 3 |
1995 - 1996 |
Fabryka Kotłów Rafako |

|
International Paper Kwidzyn S.A., Poland |
Boiler OP-140 - revamping and repair |
1993 - 1999 |
International - Paper Kwidzyn |
CRUDE OIL AND NATURAL GAS
|
LOCATION/END USER |
WORKS DECSRIPTION |
TIMING |
CONTRACT PARTNER |
 |
PKN ORLEN S.A. Poland |
Execution of mechanical/erection works in the frame of No 11235 Project "Desulphurization of cracked petrol" - core system |
2005 - 2006 |
PKN Orlen |
 |
PKN ORLEN S.A. Poland |
Prefabrication and erection of SHP pipeline |
2004 - 2005 |
Chemar |

|
PKN ORLEN S.A. Poland |
Mechanical erection of cryogenic ethylene tank |
2004 |
PETRO Remont |

|
PKN ORLEN S.A. Poland |
Erection of pining of Polyolefin plant |
2004 |
Polimex-Mostolstal Siedlce |

|
PKN ORLEN S.A. Poland |
Steel structure delivery |
2004 |
Fluor Gliwice |

|
PKN ORLEN S.A. Poland |
Apparatuses revamping |
2004 |
Chemar |

|
PKN ORLEN S.A. Poland |
Execution of works concerning piping junction of concrete tank |
2004 |
PKN Orlen |

|
PKN ORLEN S.A. Poland |
Olefin Plant II - prefabrication and erection of process piping systems |
2004 |
Polimex-Cekop/ Mostostal Zabrze Holding/ ABB Lummus Global |

|
Gas Compression Station Włocławek |
Dismantling/ reinstallation of inlet and outlet piping of gas cooler; repair of piping weld; piping preparation for testing |
2004 |
ABB Zamech Gazpetro |

|
PKN ORLEN, Poland |
Mechanical equipment erection of Polypropylene (PP) and High Density Polyethylene (HDPE) plants |
2004 |
Polimex-Cekop |

|
PKN ORLEN, Poland |
Execution of tie-ins in the mains of process and power piping systems |
2004 |
PKN Orlen |

|
PKN ORLEN S.A. Poland |
Erection of piping and erection of equipment for Olefin II |
2004 |
Chemar |

|
PKN ORLEN, Poland |
Erection of piping of propylene tank, erection of installation for liquid propylene loading and unloading from railroad tank trucks |
2004 |
PKN Orlen |

|
PKN ORLEN, Poland |
Piping of butane tank |
2004 |
PKN Orlen |

|
Gas Compressor Station Ciechanów |
Delivery, erection and start-up of complex gas piping system, mechanical erection of process equipment |
2004 |
ABB Zamech GazPetro |

|
Sweden |
Fabrication and erection of storage tank for light fuel oil |
2003 - 2004 |
Petrokraft AB |

|
PKN ORLEN. Poland |
Revamping of Petrochemical Water Units |
2003 |
PKN Orlen |

|
PKN ORLEN, Poland |
Erection of Olefin II piping |
2003 - 2004 |
ABB Lummus Global / Mostostal Zabrze / Polimex-Cekop |

|
Beckum - Buschkötter - GERMANY |
Insulation work in Leuna 2000 Refinery |
2002 - 2003 |
Iso-Perfekt |

|
FRANCE |
Prefabrication and delivery of piping |
2001 - 2003 |
Ponticelli Freres |

|
Gas Compressor Station Włocławek , Poland |
Fabrication and erection of final support for gas piping DN 1200 |
2001 |
ABB Zamech GazPetro |

|
Gas Compressor Station Włocławek , Poland |
Replacement of valves DN 1200 and DN 900 |
2001 |
ABB Zamech GazPetro |

|
Gas Compressor Station Włocławek , Poland |
Erection of compressor station 3 x 25 MW and installation of System Reducing/Measuring Station (SSRP) |
1999 - 2000 |
ABB Zamech GazPetro |

|
Gas Compressor Station Kondracki , Poland |
Erection of compressor station 4 x 25 MW |
1999 |
ABB Zamech |

|
Slovnaft Refinery in Bratislava Slovakia |
Repair and revamping of tanks |
1998 - 2000 |
Chemopetrol Litvinov - - Czech Republic |

|
Slovnaft Refinery in Bratislava Slovakia |
Erection of technological piping |
1998 - 1999 |
Potrubi Slovakia s.v.o. Kosice /Słowacja/ |

|
Gas Compressor Station Hołowczyce , Poland |
Erection of compressor station 1 x 25 MW |
1998 - 1999 |
ABB Zamech |

|
Rafineria Gdańska S.A., Poland |
Complex erection works: - prefabrication and erection of hydrogen recovery installation, prefabrication and erection of tanks and handling system of liquid sulfur, prefabrication and erection of heating network and technological piping heating system together with partial delivery of supporting structure. Total tonnage approx. 1,100 ton. |
1998 - 1999 |
Fluor Daniel/ Rafineria Gdańska |
CRUDE OIL AND NATURAL GAS 1990 - 1998
|
LOCATION/END USER |
WORKS DECSRIPTION |
TIMING |
CONTRACT PARTNER |

|
Petrochemia Płock, Poland |
Disassembly of BUTADIEN installation |
1998 |
Petrochemia Płock |

|
Petrochemia Płock, Poland |
Erection of FKK II equipment |
1998 |
Petrochemia Płock |

|
Petrochemia Płock, Poland |
Erection of DRW VI installation |
1998 |
Petrochemia Płock |

|
Petrochemia Płock, Poland |
Erection of Claus I installation |
1998 |
Petrochemia Płock |

|
Petrochemia Płock, Poland |
Erection of material tanks for needs of HOG |
1998 |
Petrochemia Płock |

|
Petrochemia Płock, Poland |
Modernization of DEMI station |
1998 |
Petrochemia Płock |

|
Petrochemia Płock, Poland |
Repair of E 103 A equipment |
1998 |
Petrochemia Płock |

|
Chemical Works CHEMOPETROL Litvinov - Czech Republic |
Design, prefabrication and erection of technological piping |
1997 - 1998 |
Chemopetrol Litvinov - - Czech Republic |

|
Petrochemia Płock, Poland |
Erection of Hydrosulfren II installation |
1997 - 1998 |
Petrochemia Płock |

|
Rafineria Gdańska S.A., Poland |
Erection of storage tanks for propane (LP6) in North Port and in Refinery - 8 pieces D=5600 mm; total weight 2400 ton |
1997 - 1998 |
Rafineria Gdańska |

|
Petrochemia Płock, Poland |
Erection of water treatment system (SUW) - 500 m 3 /h |
1997 - 1998 |
Petrochemia Płock |

|
Petrochemia Płock, Poland |
Delivery and erection of steel structure and erection of piping and equipment for hydrogen production |
1995 - 1997 |
Petrochemia Płock |

|
Petrochemia Płock, Poland |
Erection of piping of demineralized water and steam at 35 ata i 6 ata |
1995 - 1996 |
Petrochemia Płock |

|
Steel Mill Salzgitter , GERMANY
|
Erection of blast air preheaters |
1994 - 1996 |
Noell Hamburg - GERMANY |

|
Petrochemia Płock, Poland |
Repair of the boiler for catalytic cracking installation |
1993 - 1996 |
Petrochemia Płock |

|
Chemical Works CHEMOPETROL Litvinov - Czech Republic |
Erection of installation for lead free gasoline production |
1993 - 1995 |
Chemopetrol Litvinov - - Czech Republic |

|
BASF , GERMANY |
Erection of heat recovery boiler |
1993 - 1994 |
Sterinmüller - GERMANY |

|
Scholven Olefin IV - GERMANY |
Erection of piping in Refinery |
1991 - 1992 |
Dillinger Stahlbau Dillingen |

|
Petrochemia Płock, Poland |
Erection of steel structures and piping of reforming installation Nr 5
|
1991 - 1992 |
Petrochemia Płock |

|
Johann Stahl Plant Mannheim - GERMANY |
Works performed in Customer's shop - fabrication of tanks 5,000 m 3 - 10,000 m 3 ; fabrication of steel components for chemical equipment |
1990 - 1992 |
Johann Stahl Mannheim - GERMANY |

|
Mosellbay South Africa |
Erection of piping in gas and coal refineries |
1990 - 1991 |
Babcock RSA |

|
Chemical Works DOW Chemical Stade - GERMANY |
Delivery and erection of three bioreactors having total weight of 3100 ton. Erection of Containment tanks |
1989 - 1991 |
Noell Hamburg - GERMANY |

|
Hulls - GERMANY |
Erection of tanks - 5000 m 3 |
1989 |
Johann Stahl Mannheim - GERMANY |

|
Minerwa Refinery Mannheim - GERMANY |
Erection of two tanks - 7000 m 3 each |
1989 |
Johann Stahl Mannheim - GERMANY |

|
Orenburg Pipeline /former Soviet Union / |
Erection and start-up of four compressor stations |
1976 - 1979 |
AEG Kanis /Mannesmann/ - GERMANY + Energopol, Poland |
CHEMICAL INDUSTRY
|
LOCATION/END USER |
WORKS DESCRIPTION |
EXECUTING TIME |
CONTRACT PARTNER |
 |
ANWIL S.A. Włocławek |
Replacing of diaphragm production technology of chlorine by membrane one - replacement of the tank of pure brine and T232 tank of 50% soda lye
|
2005 |
Anwil |
 |
ANWIL S.A. Włocławek |
Rehabilitation of Chlorine and Soda Lye Plant - erection of steel structure, setting of apparatuses and piping dismantling of CHLOR - Unit C05 |
2005 |
Anwil |
 |
Włocławek - PET Plant under construction, Poland |
Works connected with removal of break-down in PET Plan |
2005 |
SK Eurochem |

|
Włocławek - PET Plant under construction, Poland |
Prefabrication and erection of piping in PET Plant in Włocławek
Delivery and erection of tanks and condenser in PET Plant in Włocławek |
2004 |
Eurochem / Rem-Will |

|
Zakłady Azotowe Puławy, Poland |
Erection of equipment and piping for process line of Melamine III - facility E-225; erection of piping between Carbamide and Melamine III; fabrication and erection of steel bridge on the road "E" in Melamine III Dept. |
2002 - 2004 |
Mostostal Puławy |

|
ANWIL Włocławek, Poland |
Adaptation of the column D-1451 "a" and "b" for needs of installation of synthesis gas drying - line "B". Modernization of brine tank V-107; Dismantling of LP system at construction site of vinyl chloride |
2001 |
Anwil |

|
ANWIL Włocławek, Poland |
Mechanical repair works in the Polyvinyl Complex |
2001 |
Anwil |

|
ANWIL Włocławek, Poland |
Erection of process line of Vinyl Chloride |
2000 - 2001 |
Anwil |

|
Zakłady Azotowe Puławy, Poland |
Erection of installation for Melamine II Plant |
2000 - 2001 |
Zakłady Azotowe Puławy |

|
Zakłady Azotowe Puławy, Poland |
Erection of drainage system from 4 Mpa steam collector upstream of shut-off valves DN 150 |
2000 |
Zakłady Azotowe Puławy |

|
Institute of Artificial Fertilizers Puławy , Poland |
Installation of process installation of hop extracts |
2000 |
Instytut Nawozów Sztucznych Puławy |

|
Uponor Polska Sochaczew |
Construction of new manufacturing plant of plastic piping systems, together with complete infrastructure |
1999 - 2000 |
Uponor Polska
|

|
Anwil Włocławek |
Delivery and erection of nitro-chalk production plant |
1999 - 2000 |
Prochem |

|
Glue Mixing Plant in Szczecinek , Poland |
Erection of equipment and technological piping (also made of stainless steel) |
1994 - 1995
2004 |
Kronospan -
Szczecinek |
SHIP BULDING INDUSTRY
|
LOCATION/END USER |
WORKS DESCRIPTION |
EXECUTING TIME |
CONTRACT PARTNER |

|
Flensburg , Germany |
Fabrication of stern ramp
Weight: 147 t |
2004 |
Macor Marine GmbH |

|
Gedser Habour |
Fabrication of stern ramp
Weight : 90 t |
2004 |
BLADT Industries A/S |

|
Denmark - Group of wind power plants |
Delivery and erection of the transformer platform for wind power station - weight 350 ton |
2003 |
Bladt - Denmark |

|
Denmark, Pole Nini & Cecilie |
Erection of 8 decks for two mining platforms - weight 550 ton |
2003 |
Bladt - Denmark |

|
USA , US Navy Yard |
Erection of stern loading platforms - weight 149 ton |
2003 |
MacGregor Sweden |

|
Norway |
Delivery of pontoons for fish farm - weight 54 ton |
2003 |
Techmat Norway |

|
Poland , Shipyard Gdynia |
Delivery of hull section - weight 40 ton |
2002 |
Shipyard Gdynia |

|
France, Shipyard Chantiers de l'Atlantique |
Delivery of auxiliary access platform - weight 20 ton |
2002 |
Macor Neptun Germany |

|
Holland , Shipyard Van der Giessen |
Delivery of stern port - weight 41 ton |
2002 |
TTS Sweden |

|
Spain , Shipyard Astilleros Espanoles' |
Erection of two shaft elevator for transportation of railroad cars inside the ferry |
2002 |
MacGregor Sweden |

|
Chantiers de l'Atlantique H32 |
Delivery of ship doors and platforms |
2002 |
Macor Neptun |

|
Kalliste/ Oresund |
Delivery of steel structures |
2002 |
MacGregor SWE/ TTS SWE |

|
Grenaa/ Varberg/ Trelleborg |
Delivery of loading ramps |
2002 |
Bladt Industries |

|
Shipyard Remontowa Gdańsk |
Delivery of piping |
2001 |
Stocznia Remontowa Gdańsk |

|
Finland |
Delivery of hatchway covers |
2001 |
MacGregor FIN |

|
Shipyard Gdynia |
Delivery of hatchway covers and hull section |
2001 |
Shipyard Gdynia |

|
Arhus - Denmark |
Delivery of cranes for containers - weight 900 ton |
2000 |
Konecranes - Finland |

|
Shipyard Gdynia |
Prefabrication and erection of piping systems made of austenitic steel AISI 304L and AISI 316L - deck installation on ships. Weight of installation 120 ton. |
since 1999 |
Shipyard Gdynia |

|
Kotka Finland Barcelona Spain Savannah USA |
Delivery of structural steel of cranes, working in container terminals. |
1998 |
Konecranes - Finland |

|
Indonesia |
Delivery of structural steel for conveyors. |
1992 |
Konewood |
FOOD INDUSTRY
|
LOCATION/END USER |
WORKS DESCRIPTION |
EXECUTING TIME |
CONTRACT PARTNER |

|
Brewery Kasztelan
Sierpc
|
Erection of equipment for vertical transportation in elevator building |
2004 |
Danish Malting Group Poland |

|
Brewery Heweliusz
Gdańsk
|
Erection of: gas-steam boiler house 3 x 10 t/h, steam and technological piping. Delivery and erection of the stack with modular insert |
1999 |
Elbrewery - Elblag |

|
Elbrewery Co Ltd. Elbląg |
Revamping and enlargement of water treatment station in cooperation with Berkofeld Filter |
1995 - 1999 |
Elbrewery - Elblag |

|
Elbrewery Co Ltd. Elbląg |
Delivery and erection of new installation for beer distribution and purification. |
1994 |
Elbrewery - Elblag |

|
Elbrewery Co Ltd. Elbląg |
Revamping of steam pressure reducing station. |
1994 |
Elbrewery - Elblag |

|
Elbrewery Co Ltd. Elbląg |
Complex revamping of brewing facility in cooperation with A. Ziemann GmbH. |
1994 |
Elbrewery - Elblag |

|
Kożuszki, Poland
|
Delivery and erection of steel structure for chocolate factory |
1994 - 1995 |
Master Foods Poland |

|
Kożuszki, Poland
|
Delivery and erection of steel structure of office building |
1994 |
Master Foods Poland |

|
Kożuszki, Poland
|
Delivery and erection of steel structure for manufacturing facility |
1993 - 1994 |
Master Foods Poland |
CEMENT PLANTS
|
LOCATION/END USER |
WORKS DESCRIPTION |
EXECUTING TIME |
CONTRACT PARTNER |

|
Cement Plant Ożarów |
Repair of equipment (conveyors, pumps, filters, etc.); deliveries of steel structure components and tanks (cement containers) |
1997 - 1998 |
Cement Plant Ożarów |

|
Cement Plant Strzelce Opolskie |
Dismantling and reinstallation of pulverizes of raw material, checking of gears, delivery and erection of piping. |
1995 - 1996 |
Cement Plant Strzelce Opolskie |

|
Cement Plant Strzelce Opolskie |
Prefabrication and erection of the electrostatic precipitator. |
1995 |
ABB Fläkt |
PULP AND PAPER INDUSTRY
|
LOCATION/END USER |
WORKS DESCRIPTION |
EXECUTING TIME |
CONTRACT PARTNER |

|
International Paper Kwidzyn |
Revamping of technological tanks (including piping) |
2000 - 2001 |
International Paper Kwidzyn |

|
Paper Plant ICT in Kostrzyn n/Odrą |
Prefabrication and erection of tanks made of stainless steel |
2001 |
BE&K Europe |

|
International Paper Kwidzyn |
Revamping of technological tanks and associated piping during the shut-down |
1993 - 1999 |
International Paper Kwidzyn |
INFRASTRUCTURE CONSTRUCTION
|
LOCATION/END USER |
WORKS DESCRIPTION |
EXECUTING TIME |
CONTRACT PARTNER |

|
Hannover - GERMANY |
Erection of structural steel and sound shields along the fast railroad |
2002 - 2003 |
Inkon |

|
- GERMANY |
Erection of steel barriers on overpasses on motorway Köln - Frankfurt |
2002 |
Inkon |

|
Wisłostrada - street in Warsaw |
Steel structure erection in the pit of tunnel on Wisłostrada |
2001 - 2003 |
Hydrobudowa-6 |

|
Management of Border Crossings Terespol |
Fabrication and erection of steel structure at border crossing in Sławatycze |
1998 |
Przedsiębiorstwo Usług Inwestycyjnych Biała Podlaska |

|
Bridge on Narew River in Ostrołeka |
Erection of one-arc bridge the longest one in Poland |
1994 |
ABB Sweden |

|
Pedestrian Bridges in Warsaw |
Delivery and erection of bridges |
1986 - 1992 |
|
MUNICIPAL CONSTRUCTION
|
LOCATION/END USER |
WORKS DESCRIPTION |
EXECUTING TIME |
CONTRACT PARTNER |

|
Budapest
Hungary
|
Reconstruction of 2 boilers in incinerating plant |
2004 |
Budimex |

|
Högdalen
Sweden
|
Delivery and erection of steel structure and boiler piping at incinerating plant |
2003 - 2004 |
Energo-Inwest
|

|
Nuremberg GERMANY |
Erection and start-up of 3 boilers in incinerating plant |
2000 |
Elektrim-Energetyka |

|
ZUSOK
Warszawa
|
Delivery and erection of equipment for municipal incinerating plant |
1998 - 1999 |
Budimex |
MUNICIPAL CONSTRUCTION 1990 - 1998
|
LOCATION/END USER |
WORKS DESCRIPTION |
EXECUTING TIME |
CONTRACT PARTNER |

|
Hamburg GERMANY |
Erection of two fluidized bed boilers in incinerating plant |
1997 - 1998 |
Steinmüller |

|
RMVA KÖLN GERMANY |
Erection of four boilers in municipal incinerating plant - 67 t/h of stem each one |
1996 - 1998 |
Babcock Steinmüller |

|
Hamburg GERMANY |
Erection of three fluidized bed boilers for incineration of slime from sewage-treatment plant |
1996 |
Austrian Energy and Environment |

|
Sewage Treatment Plant Belsk Duży
|
Construction of communal sewage-treatment plant |
1995 |
Urząd Gminy Belsk Duży |

|
Sewage Treatment Plant \"Czajka\" Warsaw |
Construction of bio-reactor with aeration system |
1993 |
Dyrekcja Budowy Wodociągu Północnego i Oczyszczania Ścieków Warsaw |

|
Essen - Karnap GERMANY |
Erection of boiler in incinerating plant - 7 t/h of steam |
1992 - 1993 |
Babcock |

|
Wuppertal GERMANY |
Erection of boiler in incinerating plant - 50 t/h of steam |
1990 - 1991 |
VKW |

|
Budapest Hungary |
Erection of four boilers in municipal incinerating plant |
1988 - 1991 |
Chemokomplex |
INDUSTRIAL CONSTRUCION
|
LOCATION/END USER |
WORKS DESCRIPTION |
EXECUTING TIME |
CONTRACT PARTNER |

|
Kopalnia Węgla Brunatnego Bełchatów S.A. |
Construction of TZ-1/T-G4 back-up facilities for dumping and mining services, Stalowa Wola |
2000 - 2001 |
Brown Coal Mine Bełchatów S.A. |

|
Car Showroom Stalowa Wola |
Fabrication of steel structure of car showroom for Citroen cars |
2000 |
Boker
Stalowa Wola |

|
KNAUF Bauprodukte |
Construction of Manufacturing Plant for KNAUF company, Stalowa Wola |
1999 - 2000 |
KNAUF Bauprodukte |

|
Building of Moorkens Showroom Warsaw |
Construction of show/store room and offices |
1999 - 2000 |
Progres Construction |

|
Galeria Mokotów Shopping Center Warsaw |
Steel structure and dome fabrication and erection |
1999 - 2001 |
GTC/Warbud |
SERVICE CONSTRUCTION 1990 - 1998
|
LOCATION/END USER |
WORKS DESCRIPTION |
EXECUTING TIME |
CONTRACT PARTNER |

|
IKEA Shopping Center Janki
Warsaw |
Construction of shopping facilities |
1995 |
H & O Construction |

|
Huta Stalowa Wola |
Construction of service building hall |
1991 |
Steel Mill Stalowa Wola |
APARTMENT BUILDINGS
APARTMENT BUILDINGS 1980 - 1990